Details: taking out existing cc interlocking paver blocks from footpath/ central verge, including removal of etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre leadas per direction of engineer-in-charge. earth work in embankment (lead upto 8 km) in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 m in depth earth work in embenkment to in 20 cm layers including remming and dressing the surface to required levels and slops also including 1.50 m lift and 30 m lead. the earth form cutting to be used in making in embekment or to be disposited and spoil banks with in 30 .(as per pwd sor 2022/231( a)+253 (a) s i no-4.03. s/l of stone ballast 22.4 to 53 mm size with stacking for 10 measurment etc all complete as per the direction of engineer in-charge . as per pwd sor 2020 rmr supply of screening material with stacking for measurment 11 etc all complete as per the