Description: Construction work of Synthetic Athletic Track at Sports Stadium Hapur Name of Work Construction work of Synthetic Athletic Track at Sports Stadium Hapur
Details: Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. Extra for compaction of earth work in embankment under optimum moisture conditions to give at least 95% of the maximum dry density (proctor density). Fine dressing the ground Grassing with selection No.1 grass including waterin
Sector: Infrastructure