Description: Interlocking construction work from pitch road towards Yadav Basti in Gram Sabha Motipur 56 Name of Work Interlocking construction work from pitch road towards Yadav Basti in Gram Sabha Motipur 56
Details: Excavation for foundation in ordinary soil including normal lead and lift with all completion of work and including disposal upto three chain minimum. As per SI no-251. First class b/w in 1:4 in cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc required for proper completion of work. Asper S.I.No.307(b) Concrete with 40mm gauge brick ballast / stone ballast ,f/sand & cement in proportion of 12;6;1 in foundation and under floors including supply of all materials,labour and T & P etc,required for proper completion of the work.As per SI No-273 Supply of 80 mm thick ZIG-ZAG shaped mechanically compressed inter locking cement concrete pavers block manufatured by high pressure and controlled by vibration making havuing plant dimention 200* and also including laying of interl;ocking otiles including leveling and desssing of surface in reguired level and filling joints with F/sans over previously laid WBM surface with cushion of a
Sector: RDPR