Details: clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201. de-watering from nala by diesel pumping set of 5 h.p capicity during construction of r.c.c nala including hire charge of pumping set and its pol labour t&p complete etc sor misc. new item 2 excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead up to 50 m as per technical specification clause 302.3 providing concrete m10 (1:3:6) with 40 mm stone grit for plain concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 providing concrete for
Sector: RDPR