Details: clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201. excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead up to 50 m as per technical specification clause 302.3 providing concrete m10 (1:3:6) with 40 mm stone grit for plain concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 m25 rcc supplying, fitting, and placing m.s bar reinforcement
Sector: RDPR