Details: demolishing mud phaska in terracing and disposal of material within 50 metres lead. dsr 15.27 complete in all respect as per direction of engineer in charge. (excluding gst) dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of to the dumping ground within 50 metres lead. dsr 15.56 complete in all respect as per direction of engineer in charge. (excluding gst) providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate z sections and other sections of approved make conforming to is: 733 and is: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required epdm rubber/ neoprene gasket etc. aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, aluminium snap beading for glazin
Sector: PWD