Details: clearing jungle including up rooting of rank vegetation grass bush wood trees and sapling of girth upto 30cm. measured at a height of 1 meter above ground level and removal of upto a distance of 50m. outside the periphery of area cleared as per si.no. 2.31 earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kinds of soil as per si.no. 2.8.1 diluting and injecting chemical emulsion for post-constructional anti-termite treatment (excluding the cost of chemical emulsion) treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 coarse sand) to match the existing f
Sector: RDPR