Details: earth work in excavation by mechanical means (hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. as per dsr- 2.6.1 and direction of e/i (including all taxes, labour cess but exluding gst) filling available excavated earth (excluding rock) in trenches, plinth,sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. as per dsr- 2.25 and direction of e/i (including all taxes, labour cess but exluding gst) excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. as per dsr-2.25a and direction of e/i (including all t
Sector: PWD