Description: Change of room no 3 for physically challenged room with Toilet bath room and renovation of room no 2 with C B and Treatment of anti termite at Health Center Name of Work Change of room no 3 for physically challenged room with Toilet bath room and renovation of room no 2 with C B and Treatment of antitermite at Health Center
Details: EARTH WORK Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. Excavating trenches by mechinical / manual means of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, for all depth, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m: All kinds of soil Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia Surface dressing of the ground including removing vegetation and in- equalities not
Sector: Science University