Details: e/w in excavation in foundation in ordinary soil s.i.no.251 cc work in 1:6:12 cement f/sand and 40mm gauge brick ballast i/c supply of all material labour and t&p etc. required for proper completion of work. si no. 273 m-150 brick work in 1:4 cement and c/sand as per si no. 305 p/l of 125 micron thick polythene over base concrete i/c all cost complete. laying c.c. road slab consisting of 1:1.5:3 cement c/sand and 20mm stone ballast over prepared sub grade i/c all complete of work si no. 773b making construction joints filling with bituminious board s/f of signboard or lokarpan stone
Sector: RDPR