Details: construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2.(construction of diversion ) earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (m-15) concrete with 40mm gauge stone ballast cement sand and approved grit in foundation including supply of all material labour tools and plants etc requider for completetion of the work. m-25 class r.c.c. work with cement approved course sand 2cm gauge approved stone abllast in lintals bed block and deks slab & approved slab including cost of suttering but excluding steel etc. complete supplying, fitting and placing un-coated hysd bar reinforcement in foundation/sub structure/ su
Sector: PWD