Details: construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2.(construction of diversion ) supply of hume pipe np3-900mm laying of hume pipe np3-900mm brick on edge pavement on road with bricks laid dry, joints filled with local sand including preparation of base to proper and its ramming spreading a layer of 1 cm (3/8") depth of local sand over the sub grade and including supply of all material labour and t & p etc. required for proper completion of the work. providing & fixing of ms iron project detail board complete as per enc-office order. proving of pumping set with insulation for dewatering of seapage in foundation with all materials labour tools and plants etc required for proper complete work. earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shori
Sector: PWD