Details: excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. earth work in excavation in foundation in ordinary soil including 1.5 m lift and 30 m lead all labour t&p as per pwd sch. supply & laying of base concrete in 1:5:10cement :c/sand : stone ballast 40mm including labour & material complete. brick work in 1:6 cement and coarse sand in foundation including labour & material complete. providing and laying damp-proof course 25 mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size). 12mm thick cement plaster in 1:6 with cement & f/sand mortar. supply & laying of g.s.b. including labour & material complete. p/l of 80 mm thick interlocking cement concrete rubber moulded paver blocks (tiles) floor of 30n/ mm2. r.c.c. work in 1:1.5:3 with cement, c
Sector: Infrastructure