Details: earth work in cutting in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 m in depth and e/w in 20 cm layers, including ramming & dressing the surface to required levels and slops and also including 1.5 m lift and 30m lead. the earth from cutting to be used in making embankment or to be deposited as poil bank within 30m distance (excluding royalty) as direction of e/i as si no 253 construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader/tractor mounted appropriate equipment on prepaire suface mixing by mix in place method with rotavator at omc, and compacting with smooth roller to achieve the desired density, complete as per clause 401 wbm-2-providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled 80-100 kn in stages to proper grade and camber,
Sector: PWD