Details: construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m as per technical specification clause 301.5 ( including t&p etc. complete. & excluding cost of gst) providing, laying and spreading material on a prepared sub grade, adding cement @ 2% by weight to the spread material manually mixing in place with rotavator and compacting with the road roller and omc to achieve the desired uncomfined compressive strength and to form a layer of sub-base. ( including all material & t&p etc. complete. & excluding cost of gst) providing, laying and spreading material on a prepared sub base, cement @ 4% by weight to the spread material manually mixing in place with rotavator and compacting with the road roller and omc to achieve the desired uncomfin
Sector: PWD