Details: construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m,transporting to site, spreading, grading to required and compacting to meet requirement oftables 300.1 and 300.2 with a lead upto 1000 m as per technical specification clause 301.5 cement treated sub base-providing, laying and spreading material on a prepared sub grade, adding cement @ 2% by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at omc to achieve the desired unconfined compressive strength and to form a layer of sub-base. cement treated base-providing, laying and spreading material on a prepared sub base, cement @ 4% by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at omc to achieve the desired unconfined compressive strength and to form a layer of sub-base/base tack coat-providing and applyi
Sector: PWD