Details: dismantling cement concrete or granolithic floors including base concrete and including stacking of dismantled materials as directed by engineer-in-charge within a distance of 60 meter, t&p etc.complete as per si no. 697 dismantling existing plaster including disposal of refuse as directed by engineer-in-charge within a distance of 60 meter t&p etc.complete as per dsr no. 15.50 12mmm thick plaster with cement & approved course sand mortar1:6 on brick work (minimum thickness not less than 10mm) including rakining the joints washing and cleaning and supply of all material &labour t&p etc. required for proper complete as per si no 800 for paitch work as per dsr no. 14.1.1 cement concrete with 2cm. gauge approved brick ballast, approved coarse sand and cement in the proportion of 8:4:1 including supply of materials labour and t&p etc. required for proper completion of the work as per s.i. no. 275 30 mm thick flush door shutter including supply of all material t & p but excluding its all
Sector: PWD