Details: const of open strom drain (300x300) i/c earth work in excavation,pcc in 1:4:8 mix for base, brick work in 1:4 cement motar in foundation, cement plaster 1:3 finished with a floating coat of neat cement, cement concrete flooring 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. const of open strom drain (300x450) i/c earth work in excavation,pcc in 1:4:8 mix for base, brick work in 1:4 cement motar in foundation, cement plaster 1:3 finished with a floating coat of neat cement, cement concrete flooring 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. const of open strom drain (300x600) i/c earth work in excavation,pcc in 1:4:8 mix for base, brick work in 1:4 cement motar in foundation, cement plaster 1:3 fin
Sector: Infrastructure