Details: dismantling cement concrete or granolithic floors including base concrete and including stacking of dismantled materials as directed by engineer-in-charge within a distance of 60 meter, t&p etc.complete as per si no. 697 dismantling existing plaster including disposal of refuse as directed by engineer-in-charge within a distance of 60 meter t&p etc.complete as per dsr no. 15.56 12mmm thick plaster with cement & approved coarse sand mortar1:6 on brick work (minimum thickness not less than 10mm) including rakining the joints washing and cleaning and supply of all material &labour t&p etc. required for proper complete as per dsr no. 14.1.1 p/l water proffing treatment as per chapter 11 item 14 new including supply of all material &labour t&p etc. required for proper complete dsr no. 22.1 30 mm thick flush door shutter including supply of all material t & p but excluding its all fitting etc. as per dsr no. 26.87.1 r.c.c work in 1:1.5:3 with cement corse sand &20mm. stone grit including sup
Sector: PWD