Details: removal of unserviceable soil including excavation, loading and disposal but excluding replacement by suitable soil which shall be paid separately as per clause 305. as per sor ch. 25 construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at omc, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. providing and laying dense graded bituminous macadam with higher capacity hmp using crushed aggregates of specified grading, premixed with bitumi
Sector: PWD