Details: excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts. earthwork in cutting or in embankment in ordinary / moorum soil, excavation to be in the from of regular pits not exceeding 1/2 metre c 20") in depth and earthwork in embankment to be in 20cm(8) layers including ramming and dressing the surface to required levels and slopes and also including 1.5metre (5ft) lift and 30m.(100ft) lead. the earth from cutting to be used in making embankment or to be desposited as spoil banks within 30m.(100ft) distance as directed by the engineer-in-charge. construction of granular sub-base by providing close graded material, mixing in a mechanical mix plant at omc, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibr
Sector: PWD