Details: (part-a) for pc surfaceconstruction of embankment with approved material obtained from borrow pits with with all lift and lead transporting to site upto 5 km , spreading, gradingto required slop and compacting. (as per sor). including cost of, all material, labour, t&p, royality, labour cess, all taxes complete. but excluding gst (cement treated sub base) providing, laying and spreading in uniform layers with motor grader on a prepared sub grade/sub base, cement @ 2% by weight to the spread material manually,mixing in place with rotavator and compacting with road roller at omc to achieve the desired unconfined compressive strength and form a layer of base. including cost of all material, labour, t&p,and royalty but excluding cost of gst. (cement treated base) providing, laying and spreading in uniform layers with motor grader on a preparedsub base, cement @ 4% by weight to the spread material manually,mixing in place with rotavator and compacting with road roller at omc to achiev
Sector: PWD