Details: laying and jointing pvc pipe. heading excavation in foundation in ordinary soil (loam clay, or sand) including lift upto 1.5 metre (5 fts.) and lead upto 30 m (100 fts) & including filling, watering and ramming of excavated earth into the trenches or into the space between the bullding and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge upto a distance of 30 m. (100 fts) from the foundation trenches. sl. no.-251
Sector: RDPR