Details: excavation in foundation in ordinary soil (lome clay or sand ) including lift upto 1.5m & lift upto 30.00mtr. including filling watering and ramming ofexcavated earth in to the trenches or in to the space between the building and the sides of foundation trenches or in to the plinth as dircted by the engineer in charge up to a distance of 30.00mtr. from the foundation trenches as per si. no.2.1.1 providng and laying cement concrete 1:6:12 (1cement :6 fne sand :12 graded brck ballast 40mm nominal sze). including supply of all materials, labour and t &p etc. required for proper completion of the work.as per pwd sch.. 273 first class brick work in 1:4 cement and fine sand of 1.25 f.m. mortar in foundation and plinth including supply of all materials,labour and t&p etc required for proper completion ofthe work. as per s i. no. 6.1.1 construction of granular sub base by providing coarse graded material spreading in uniform layers with mortar grader on prepared surfaces mixing by in place
Sector: Export promotion