Details: dismentalling of b.o.e soling/inter locking tiles including stacking of servicable material and disposal of unservicable material within a lead of 50m as per direction of ei/c (labour only) (pwd sor 2022-23, chepter-20, serial no.19 item no. new) deduction of old interlocking tiles class-150 (non modular) brick work in 1:4 cement and fine sand mortar in foundation and plinth including supply of all materials, labour and tools and plants, etc. required for proper completion of the work. (fine sand not less than in 1.25 fm) (pwd sor 2022-23 chapter no-06 item no. 6.1 a spec. no. 6.1.1 a) 12 mm thick cement plaster with cement mortar in proportion of 1:4 cement & fine sand (dholpur sand not less than in 1.25 fm) of single coat for interior plastering upto floor two level including intarnal rounded angles chamfers, and rounded angles not exceeding 80mm in girth and finished even and smooth. (pwd sor 2022-23 chapter no-13 item no. 13.1 spec. no. 13.1.1) gra
Sector: RDPR