Details: earth work excavation by hydrolic excavator 0.90 bucket capacity including 1.50m lift and t&p etc. filling/laying of earth 15.00 cm thick over geo textile bags in pitching including cost of all material, labour, t&p etc complete. supply & laying of nylon crate of size 1 m x 1 m x 1 m filled with local available earth (preferable sandy soil) in hdpe woven bags including tying/stitching with sutali and placing in proper position including cost of all material, labour, t & p etc. complete in all respect supply and laying of gabion of size 1.80 m x 1.20 m x 0.50 m filled with local available earth (preferably sandy soil) in geo bags of size 1 m x 0.75 m including tying/stitching with sutali and placing in proper position including cost of all material, labour, t & p etc. complete in all respect supply and laying geo textile bags of size 1 m x 0.75 m filled with local available earth (preferable sandy soil) in launching apron below l. w. l. and pitching including tying/stitching with s
Sector: Irrigation