Details: excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5m and lead upto 30m and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of the foundation work. csi no. 4.01 concrete with 4cm gauge stone ballast, coarse sand (f.m. 1.8 to 2.5) & cement in proportion of 12:6:1 in foundations &under floors including supply of all materials, labour and tools and plants etc. required for proper completion. csi no. 5.02 cement concrete with 2cm gauge approved hard stone ballast, coarse sand (f.m. 1.8 to 2.5) and cement in proportion of 4:2:1 including supply of all materials, labour,side shuttering if required and t&p etc. required for proper completion of work. csi no. 5.06 rcc work with cement, approved coarse sand (f.m. 1.8 to 2.5) and 2 cm gauge graded approved hard stone ballast like granite, quartzite etc from dalla, jhansi or other quarries in proportion 1:1.5:3 in lintels of d
Sector: Distribution