Details: construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacting to meet requirement etc as per mord clause 300.1 and 300.2 with a lead upto 1000m as per technical specification clause 301.5. (carted earth work for 1 km ) but excluding gst for proper completion of the work as per direction of engineer in charge. (exculding royalty.) excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per technical specification clause 302.3 including supply of all meterial t&p, labour and all taxes , royalty etc. but excluding gst for proper completion of the work as per direction of engineer in charge. construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting wit
Sector: PWD