Details: construction of subgrade with material obtained from borrow pits (for local earth work) construction of embankment with approved material obtained from availble land as permitted and approved by engineer-in-charge and as per technical specitaion clause 301.3.4.1, with all lifts and leads, spreading, grading to required and compacting to meet requirement of tables 300.1and 300.2 as per technical specification clause 301.5 (i/c labour cess and excluding gst) providing, laying, spreading material on a prepared sub grade,adding cement @ 2% by the weight of the spread material manually mixing in place with rotavator and compacting with road roller at omc to achieve the desired unconfind compressive strength and to form a layer of sub-base.. (i/c labour cess and excluding gst) providing, laying, spreading material on a prepared sub base, cement @ 4% by the weight of the spread material manually mixing in pl
Sector: PWD