Details: shifting of 33kv line supply of 33 kv xlpe insulated armoured al. cable of size 3x300 mm2 supply & of heat shrinkable jointing kit outdoor for 33 kv 3x300 sq. mm xlpe cable make rycheme/3m supply & of heat shrinkable jointing straight through kit for 33 kv 3x300 sq. mm xlpe cable make rycheme/3m supply & laying of 160 mm dia. hdpe pipe by horizontal drilling by hdd method as per site condition, for underground piping (trenchless) for road crossing. laying of 33 kv 3x300 sqmm. xlpe cable underground through hdpe pipe at 1050 mm below the ground surface.(by hdd method) for road crossing laying of 33kv cable by digging of trench and providing of brick on both side of cable then filling of sand in the trench finnally trench will be covered with stone slab for 3x300sq.mm cable laying of 33kv cable by dressing and winding on gi cable trey into constructed pakka cable trench supply and laying of g.i. pipe 6" dia with clamp and nut & bolts supply & of 11 mtr. long steel tubulor pole
Sector: Distribution