Details: construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2. providing laying and spreading material on a prepared sub grade adding cement@2% by weight to the spread material manually mixing in place with rotavator and compacting with rhe road foller at omc to achieve the desired unconfined compressived strength and to from a layer of sub-base. morth spec 403 providing laying and spreading material on a prepared sub base cement @4% by ewight to rhe spread meterial manually mixing in place with rotavator and compacting with the road roller at omc to achueve the desired unconfined compressive strength and to form a layer of base morth spec 405 providing and laying tack coat with bitumen vg-10 using pressure distributor at the rate of 0.35 kg. (as per uppwd) per sqm on the prepared primed granular surface cleaned with mechanical broom providing
Sector: PWD