Details: road work earth work in cutting or in embankment in ordinary soil excavation to be the from of regular pits not exceeding ½meter (20'' ) in depth and earth work in embankment to be in 20cm (80'' ) layers,including ramming and dressing the surface to required levels and slopes and including 1.5m (5'' ) lift and 30m (100'' ) lead. the earth form cutting to be used in making embankment or to be deposited as spoil banks within 30m (100'' ) distance as directed by the e/i. (excluding gst) providing, laying and spreading gsb graded material on a prepared sub grade, adding cement opc @ 2% by weight to be spread on material manualy, mixing in place with rotavator and compacting with the road roller at omc to achieve the desired unconfined compressive stregth and to form a layer of sub base. construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, watering and c
Sector: PWD