Details: construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m as per technical specification clause 301.5 (but excluding gst) providing laying and spreading material on a prepared sub grade, adding cement @ 2% by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at omc to achieve the desired unconfined compressive strength and to from a layer of sub-base. (but excluding gst) providing laying and spreading material on a prepared sub base, cement @ 4% by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at omc to achieve the desired unconfined compressive strength and to from a layer of sub-base/base. (but excluding gst) providing and applying tack coat with bitumen (vg-10) using bitumen pressure di