Details: excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m construction of granular sub-base grading-i conforming to table 400-1 by providing, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to achieve the desired density, complete as per morth iind revision 2019 specification clause 401table 400-1(as per morth iind revision 2019 clasue 401 table 400-2 grading-1) providing and applying tack coat with bitumen vg-10 using pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with air compressor. complete as per morth vth revision specification clause 503. providing and laying dense graded bituminous macadam with
Sector: PWD