Details: earth work in cutting or in filling in ordinary soil, excavation to be in the form of regular pits not exceeding 1/2 meter in depth and earth work in embankment to be in 20cm layers, including ramming & dressing the surface to required levels and slopes and also including 1.5 m lift and 30m lead. the earth from cutting to be used in making filling or to be deposited as spoil banks with in 30 m distance as directed by engineer-in-charge. moorum filling including supply of necessary quantity of moorum from a distance not exceeding from the site of work and including watering, dressing etc. rate to include cost of all materials, labour and t&p etc required for proper completion of the work (rate is including royality) cement concrete work with 40mm gauge stone ballast, sand and cement in proportion of 12:6:1 in foundation including supply of all materials, labour and t&p etc required for proper completion of work. for 1.0 providing & laying of polythene sheet 125 micron thick before l
Sector: RDPR