Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, shaplings and trees girth upto 300 mm, removal of stumps of trees cut earlier and disposal of unservicable material and stacking of servicable material to be used (the rate are excluding g.s.t. which will be paid extra as applicable) construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required and compacted to meet requirement of tableno.300-2 (the rate are excluding g.s.t. which will be paid extra as applicable) excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto 1000 metres. (the rate are excluding g.s.t. which will be paid extra as applicable) construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of oth
Sector: PWD