Details: excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50 m. and lead upto 30 m. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplusearth as directed by the engineer-in-charge upto a distance of 30 m. from the foundation trenches. (where machine can not reach/move). sor no 251a including cost of, all material, labour, t&p, royality, labour cess, all taxes complete. but excluding gst. earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 m.in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levels and slopes and also including 1.50 m. lift and 30 m. lead. the earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30 m. distance as dire
Sector: PWD