Details: excavation in foundation in ordinary soil (loam clay, or sand ) including lift upto 1.5 m & lead up to 30.0 mtr & including filling,watering and ramming ofexcavated earth in to the trenches or in to the space between the building and the sides of foundataion trenches or in to the plinth and removal & disposal of surplus earth as directed by the engineer- in-charge up to a distance of 30.0 mtr from the foundation trenches .as per dsr-2.8.1 e/w in cutting or in embankment including cartage of 5 km lead. dsr2.25a cement concrete work in 1:4:8 with cement coarse sand and stone ballast including all. dsr-4.1.8 m-150 brick work in 1:6 cement sand mortor etc all complete work in foundation upto plinth level dsr 6.4.2 m-150 brick work in 1:6 cement sand mortor etc all complete work in foundation upto plinth level dsr 6.4.1 providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derive