Details: dismenteling of existing damaged plaster/floor, room, office, varandha, hall wall p/l vertified tiles of size complite work as per direction of e/i , room, office, varandha, dado, kitchen, deduction for door earth work in cutting in ordinary soil including dressing and ramming of bottom and disposal of surplus excavated earth as directed by engg.-in-ch.si no.253 earth work in excavation for foundations in soil including dressing and ramming of bottom and disposal of surplus excavated earth . providing and laying cement concrete 1:4:8 mix (1 cement, f/sand, graded brick aggregate 40 mm) including supply of all materials. labour and t&p etc.required for proper completion of the work .si 275, apren m-150 class brick work over base concreate in cement mortar 1:3 including all material, labour, t&p etc. complete in all respect. si no.307, foundation, kitchen, coloumn r.c.c. work with 1:2:4 cement, coarse sand and 20 mm guage approved stone grit to cover the crossing over drain etc all com
Sector: RDPR