Details: dismolishing brick work manually/by mechanical means including stacking of sarviceable material and disposal of unserviceble material within 50 meters lead as per direction of engineer in charge all kinds of soil supplying and stacking of good earth at site. filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. 1:5:10 (1 cement : 5 manufactured sand derived from recycledconcrete aggregate (rca) : 10 graded stone aggregate 40mm nominal size recycled aggregate (ra) ) (ii) r.c.c. work in plinth beam (i) r.c.c. work in lintel (iv) r.c.c. work in slab steel reinforcement for r.c.c. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. th
Sector: Sugar