Details: providing and applying tack coat with bitumen vg-10 using bitumen pressure distributor at the rate of 0.25 kg per sqm on the prepared cleaned primed surface (ref. to mort&h specification no.503) including cost of, all material, labour, t&p, royality, labour cess, all taxes complete. but excluding gst. providing and laying dense graded bituminous macadam with higher capacity batch type hmp using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per morth specification clause no. 505 complete in all respects.including cost of, all material, bitumen, labour, t&p, all taxes and labour cess complete. but excluding gst. providing and laying bituminous concrete (gr-ii) with 120 tph ba
Sector: PWD