Details: dismantling of old brick laid on edge kharanja including stacking of old bricks. as per n.i. no.- 3 ch.-20 earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 m. in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levels and slopes and aiso including 1.50 m. lift and 30 m. lead. the earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30 m. distance as directed by the engineer incharge. (royality removed by govt ) for small works/ abadi area. (where machine can not move ). including cartage. as per analysis of rate. brick soling with straight over brunt bricks laid on edge and dry (labour only) including preparation of subgrade to prescribed camber, filling joints with local earth spreading a blinding coat 1 cm (3/8") depth of local earth over the entire surface and including labour t&p etc.required for proper comple
Sector: RDPR