Description: Construction of Pulandar to Nuriyara Link Road to Girsi Link Road Including 05 Years Maintenance Cost in Year 2024 25 Name of Work Construction of Pulandar to Nuniyara Link Road to Girsi Link Road Including 05 Years Maintenance Cost in Year 2024 25
Details: Construction of embankment with approved material obtained from borrow pits with all lifts upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-1 and 300.2 with lead up to 1000m as per technical specification clause 301.5 Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density as per MORD specification 401 Providing, laying and spreading material on a prepared base, cement @ 4%by weight to the spread material manually, mix in place with Rotavator and compacting with the Road Roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base. Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with
Sector: PWD