Details: dismantling of flexible pavment and disposal of dismantle material upto a lead of 1000meters, stacking seviceable and unseviceable materials separately dsr 2023 15.59. banking excavated earth by mechanical / manual means in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and roiling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc, lead upto 50 m and for all lift: all kinds of soil dsr 2023 i.no 2.3.1 providing, laying spreading & compacting of granular sub base (gsb) by providing close graded (fr-1) materials, sprading in uniform layers with mortor graded on prepared surface, mixing by mix i n placed method with rotovater at omc and compacting with in layers with smooth wheeled vibratory roller to achieve the desired density, complete as per mor &h clause 401& as directed by engineer incharge
Sector: Urban Authority