Details: providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density and including all material, labour, labour cess, t&p royalty, all tasex ect. complete as per direction by i-in-c but excluding g.s.t. providing and applying primer coat with ss -1 grade bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means and including all material, labour, labour cess, t&p royalty, all tasex ect. complete as per direction by i-in-c but excluding g.s.t. providing and laying dense graded bituminous macadam with 100-120 tph batch type hmp producing an average output of 75 tonnes per hour using
Sector: PWD