Details: construction of embankment with approved material obtained from borrow pits with all lifts upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-1 and 300.2 with lead up to 1000m complete all as per mord technical specification clause 301.5 (rates are including all taxes, royalty, labour cess etc but exculding gst shall be paid as per applicable) construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to achieve the desired density complete all as per mord technical specification 401 (rates are including all taxes, royalty, labour cess etc but exculding gst shall be paid as per applicable) providing, laying, spreading and compacting stone aggregates of specific sizes of 45-63 mm to water bound macadam grading 2 specification including spreading in uniform
Sector: PWD