Details: providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification clause 405. including all taxes but excluding gst providing and applying primer coat with bitumen emulsion (ss-2) grade on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per technical specification clause 502. including all taxes but excluding gst providing and applying tack coat with bitumen (vg-10) using bitumen distributor at the rate of 0.25 kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per technical specificatio
Sector: PWD