Details: construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 meter transporting to sites spreading grading to require and compaction to meet requirement of table 300.1 & 300.2 with a lead up to 50 meter as per mord technical specification cause 301.5 mord sepecification 301.5(i) s.no. 3.4 construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and loads, transporting to site, spreading, grading to required and compacted to meet requirement of table 300.2 with lead upto 1000 m. as per technical specification clause 303.1 including stablization with 2% slaked lime including mixing with rotavator complete. providing, laying and spreading material on a prepared sub grade, adding cement @ 2% by weight of the spread material manually mixing in place with rotavator and compacting with the road roller at omc to achive the desired unconfined compressive strength and to form a layer of sub base. prov
Sector: PWD