Details: construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-1 and 300.2 as per technical specification clause 301.5 but excluding gst for proper completion of the work as per direction of engineer in charge. (exculding royalty.) excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per technical specification clause 302.3 but excluding gst for proper completion of the work as per direction of engineer in charge. (exculding royalty.) construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification. clause 401. including supply
Sector: PWD