Details: earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kinds of soil. (dsr 2018 2.8.1) providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level :1:3:6 (1 cement : 3 coarse sand (zone-iii) : 6 graded stone aggregate 20 mm nominal size) (dsr 2018 4.1.5) brick work with common burnt clay f.p.s. (non modular) bricks of class designation 7.5 in foundation and plinth in:cement mortar 1:6 (1 cement : 6 coarse sand)(dsr 2018 6.1.2) 18 mm cement plaster in two coats under layer 12 mm thick cement plaster 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster 1:6 (1 cement : 6 fine sand)
Sector: Generation